lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 15ft for Small Medium Large Dog
$13.99
Price: $13.99
(as of Jun 02, 2024 14:14:49 UTC – Details)
From the brand
lynxking
A factory brand specializing in pet supplies with a professional team. We insist on using the best materials to make the best products.
lynxking dog leasgh series
dog leash and collar
slip lead & check cord series
slip lead & check cord series
slip lead dog leash Braided
Dog Leash Webbing Lead
Check Cord Dog Leash Long
Dog Collar Soft Padded
Snap lead dog leash
Braided Dog Training Leash
Double Handle Dog Leash
Product Dimensions : 180 x 0.38 x 0.04 inches; 7.37 ounces
Item model number : LL-1
Date First Available : July 20, 2019
Manufacturer : Keenleader co.,ltd.
ASIN : B07WYTJ73P
SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 15foot,color Black, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
Customers say
Customers like the quality, size and performance of the leash. For example, they mention it’s well made, long enough and works well for their purposes. They also appreciate the handle, saying it’ll be soft on trainer hands. Customers are also happy with recall training, value, and appearance.
AI-generated from the text of customer reviews

$13.99
There are no reviews yet.