- 6%

Dog Training Leash 50ft, 30ft, 20ft, and 15ft Long Leads, for Dog Training | Extra Long Line Dog Leash with Handle Great for Puppies & Dogs Training |Dog Leash| Nylon Durable Traction Rope

Original price was: $8.44.Current price is: $7.94.

Added to wishlistRemoved from wishlist 0
Add to compare


Price: $8.44 - $7.94
(as of May 24, 2024 06:43:06 UTC – Details)


Our dog training leash offers unparalleled versatility with four length options: 50ft, 30ft, 20ft, and 15ft suited for various training needs and daily walks. Crafted from durable polypropylene fiber, this leash ensures both strength and lightness, while the non-elastic design enables controlled yet unrestricted movement. The metal rotating buckle prevents tangling, allowing dogs to explore freely while facilitating obedience training, making it an ideal companion for outdoor adventures, training sessions, and leisurely walks.
Product Specifications:

  • Available Colors: Black, Red, and Blue
  • Available Lengths: 50ft, 30ft, 20ft, and 15ft
  • Suitable for: All Size Puppies and Dogs
  • Material: Polypropylene Fiber

Why Choose Our Long Dog Lead?

  • Versatile Length Options: Choose from 50ft, 30ft, 20ft, and 15ft to accommodate diverse training needs.
  • All-Breed Suitability: Suitable for all dog breeds, offering tailored training solutions for various purposes.
  • Durable Polypropylene Build: Crafted from sturdy, lightweight polypropylene fiber for lasting use.
  • Tangle-Free Rotation: Equipped with a 360° rotating buckle to prevent leash tangling during walks or training.
  • Non-Elastic Design: Ensures controlled movement without elasticity, enabling effective training and walks.
  • Multi-Purpose Utility: Ideal for obedience training, hiking, camping, hunting, and beach activities.
  • Three Color Options: Available in Black, Red, and Blue to suit personal preferences.

Upgrade your dog’s training with our versatile, tangle-free Dog Training Leash – add it to your cart now!
If you have any questions about the product you received, do not hesitate

Product Dimensions ‏ : ‎ 590.55 x 0.79 x 0.1 inches; 7.41 ounces
Item model number ‏ : ‎ A-ONE GOODS
Date First Available ‏ : ‎ December 3, 2023
Manufacturer ‏ : ‎ A-ONE GOODS
ASIN ‏ : ‎ B0CLLWK7WF
Country of Origin ‏ : ‎ China

EXTRA LONG DOG LEAD: We have different sizes of dog training lead to choose from: 50ft, 30ft, 20ft, and 15ft. In addition we have three colors available Black, Red, and Blue. Four length for your choice according to your different training purposes.
DOG TRAINING LEASH: Our long dog lead is suitable for all breeds. We have four lengths for different training purposes. The shorter lead can be used for daily walking and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
PREMIUM QUALITY: Our training lead for dogs is made of durable high quality polypropylene fiber, this dog leash is durable, heavy duty, lightweight, easy to carry and use. Long line for dogs is not elastic, allowing you and your dog to walk or run within a good distance.
METAL ROTATING BUCKLE: This long dog training leash has a rotatable buckle, which you can fasten on dog’s collar. The hook can be rotated 360° and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction without any leash tangling.
WIDELY USABLE: Our dog training rope can make the dog run freely, and teach your dog to recall and train obedience tracking. It is suitable for dogs of different sizes, also great for hiking, camping, training, hunting, backyard, beach, and outdoor sports or swimming.

Dog Training Leash 50ft, 30ft, 20ft, and 15ft Long Leads, for Dog Training | Extra Long Line Dog Leash with Handle Great for Puppies & Dogs Training |Dog Leash| Nylon Durable Traction Rope
Dog Training Leash 50ft, 30ft, 20ft, and 15ft Long Leads, for Dog Training | Extra Long Line Dog Leash with Handle Great for Puppies & Dogs Training |Dog Leash| Nylon Durable Traction Rope

Original price was: $8.44.Current price is: $7.94.

NDI ESSENCE
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart